Design

The first stage of any Biomass heating installation starts with design.

This is where we will get a comprehensive understanding of the requirements.

We will carry out an in-depth feasibility study identifying the correct sizing of the system required and the cost efficiency including advising on RHI. We will also look at the duty of the boiler and consider output requirements with respect to peak demands or base load.

Design